Apollo 11 Technical Crew Debriefing - 31 July 1969
Three versions of the document are presented below:
Scans and PDF formating by John Hargenrader, NASA HQ History Office, October 2005.
Adobe Acrobat Reader is required to read PDF files and can be downloaded at no cost.
Volume I - Cover, Contents, Pages 1-1 to 6-30 ( 2.5 Mb )
- Section 1 - Suiting and Ingress
- Section 2 - Status checks and Countdown
- Section 3 - Powered Flight
- Section 4 - Earth Orbit and Systems Checkout
- Section 5 - TLI through S-IVB Closeout
- Section 6 - Translunar Coast thru Drogue Removal
Volume I - Pages 6-31 to 9-30 ( 2.9 Mb )
- Section 6 - Translunar Coast (continued)
- Section 7 - LOI through Lunar Module Activation
- Section 8 - Lunar Module checkout through Separation
- Section 9 - DOI through Touchdown
Volume I - Pages 10-1 to 10-82 ( 2.8 Mb )
- Section 10 - Lunar Surface
Volume II - Cover, Pages 11-1 to 14-16 ( 2.4 Mb )
- Section 11 - CSM Circumlunar Operations
- Section 12 - Liftoff, Rendezvous, and Docking
- Section 13 - Lunar Module Jettison Through TEI
- Section 14 - Translunar Coast
Volume II - Pages 15-1 to 24-24 ( 2.6 Mb )
- Section 15 - Entry
- Section 16 - Landing and Recovery
- Section 17 - Geology and Experiments
- Section 18 - Command Module Systems Operation
- Section 19 - Lunar Module Systems Operation
- Section 20 - Miscellaneous Systems, Flight Equipment, and GFE
- Section 21 - Visual Sightings
- Section 22 - Premission Planning
- Section 23 - Mission Control
- Section 24 - Training
Volume II - Pages 24-25 to 27-1 ( 2.6 Mb )
- Section 24 - Training (continued), including Lunar Surface Training
- Section 25 - Human Factors
- Section 26 - Miscellaneous
- Section 27 - Conclusing Comments (None)
Apollo 11 Technical Crew Debriefing ( HTML Doc )
Apollo 11 Technical Crew Debriefing ( 1.2 Mb PDF )